Greg Nash
New member
We have completed two Parking garages this year totaling roughly 700,000 sq ft. being for a local college they have both have been loaded with gum and never been cleaned. the first garage we ran over 40 gpm the second we dropped to 30 gpm because the amount of water on the first overwhelmed our filtration unit. we have one tenativly scheduled next month over 1 million sq ft. we also two more garage bids out totaling about 150,000 sq ft. It should turn out to be a nice year if we can secure all the garage bids we have out.http://splashandash.com/concrete_cleaning