An interested party to the UAMCC just sent me a recent award (Jan 1, '09) in S.Calif for sidewalk cleaning.
Folks there is money out there....you got to find it!!!
XXX Boulevard (Between XXX Street and XXXX Boulevard
-187,546 sq.ft.)
• Daily machine sweeping and debris removal from sidewalks; wheelchair ramps; storefronts;
on, under and around fixtures; seven (7) days a week
• Twice per month hot pressure wash sidewalks, wheelchair ramps, tree well covers and curb
tops, including gum and substance removal
tops, including gum and substance removal
• Once quarterly pressure wash crosswalks, curb faces, and concrete gutters. To include
substance removal
• Sweep or remove debris from curb return and gutter line, based on City Street Sweeping
Schedule.
d Avenue (between Bry and Hrd Street· 39,033 sq.ft.)
• Once per month hot pressure wash sidewalks, midblock decorative concrete street portions,
wheelchair ramps, curb faces, curb tops, tree well covers and fixtures, and gum and
substance removal
substance removal
• Sweep or remove debris from curb return and gutter line, based on City Street Sweeping
Schedule.
d Avenue (between Bry and Hrd Street· 39,033 sq.ft.)
• Once per month hot pressure wash sidewalks, midblock decorative concrete street portions,
wheelchair ramps, curb faces, curb tops, tree well covers and fixtures, and gum and
substance removal
Colo Street (Between Glele Av and Easterly City limits - 90,450 sq.ft.)
• Once per month removal of trash and debris from sidewalks, storefronts, wheelchair ramps,
curb returns, gutters and around fixtures. 2nd week of the month.
• Once per month hot pressure wash sidewalks, wheelchair ramps, curb faces, curb tops,
• Once per month hot pressure wash sidewalks, wheelchair ramps, curb faces, curb tops,
fixtures and trash receptacles, and gum and substance removal. 4th week of the month.
Broadway (Between Broulevard to Gle Avenue· 44,292 sq.ft.)
• Once per month removal of trash and debris from sidewalks, storefronts, wheelchair ramps,
curb returns, gutters and around fixtures
• Once per month hot pressure wash sidewalk, crosswalks, wheelchair ramps, tree well
• Once per month hot pressure wash sidewalk, crosswalks, wheelchair ramps, tree well
covers, curb faces, curb tops, bus benches, bus shelters and trash receptacles, and gum
and substance removal.
and substance removal.
Contract Detail
1. Original Contract with XXXXXe Systems
2. Change Order (Maintain Current Service Level)
3. Change Order for Additional Scope of Work to include
3. Change Order for Additional Scope of Work to include
quarterly pressure washing and cleaning of the Exchange
Alley
Change Order for Additional Scope of Work to include
Change Order for Additional Scope of Work to include
quarterly pressure washing and cleaning of the MoXXXXe
Shopping Park
Shopping Park
Cost
$ 262,356.00
$ 150,000.00
$ 10,000.00
$ 20,000.00
$ 20,000.00
TOTAL: $ 442,356.00